2.1 Porosity defect is easily to form in the final solidification zone of the outer layer. More outer layer needs to be melted during the core filling. Cost will be increased as well as core feature be affected. 3.1 Iron liquid is spreading at a slow rate in the mould cavity. |
BEIJING SINO STEEL ENGINEERING & EQUIPMENT CO., LTD.
Beijing Sino Steel Engineering & Equipment Co., Ltd. is concentrating on developing of ferrous & non-ferrous making and Rolling technology, mainly.
As one of the most experienced Chinese suppliers of complete line and components for steel and non-ferrous industries, Beijing Sino Steel Engineering & Equipment Co., Ltd. is engaged in design, manufacturing, engineering and service activities on word-wide basis.
Overseas Partners (Office):
India, Indonesia, Malaysia, Thailand, Korea, Turkey, UAE, Qatar, Iran, Saudi Arabia, Kuwait, Germany, France, Canada, USA, Brazil, Etc.
MAIN SCOPE SUPPLY:
EPS Project Line:
EAF, LF, Continuous Casting Machine, Preheating Furnace, Hot Rolling Mill Line, Cold Rolling Line, Centrifugal Casting Line, Slitting Line,Cut-to-length Line, Cleaning Line, Pickling Line, Coating line, Levelling line, Billet grinding line ETC.
Components & Parts:
Mill stand, Coiler, Uncoiler, Gearbox, Leveller, Copper Mould Tube, Copper Mould Plate, Water Jacket, Water Cooled Cable, Forged Rolls, Casting Rolls, Roll Shell, Roll Core,Bearing, Universal Shaft, Lathe, ETC.